Project Completion Certificate (Ground Water)
Scheme ID: 20053303 Name of Scheme: TIPATIYA No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2488 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 30-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 1 21.86/145.34 TIPATIYA 26.70888 79.84363
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 550/58 TIPATIYA 26.70888 79.84363
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 TIPATIYA 26.70888 79.84363
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.0123
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.453
2 HDPE 90 3.626
3 HDPE 110 1.234
4 HDPE 125 0.313
5 HDPE 140 0.534
HSC Connection
Sno. Total Nos.
1 346
Other Details
2.75
0.00
2.26
10-Apr-2024
11-Apr-2024