Project Completion Certificate (Ground Water)
Scheme ID: 20053335 Name of Scheme: Paharipur No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3833 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 16-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.21/212.21 PAHARIPUR 26.65374 79.81991
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 800/65 PAHARIPUR 26.65374 79.81991
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/18 PAHARIPUR 26.65374 79.81991
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.01350
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.681
2 HDPE 90 4.372
3 HDPE 110 1.369
4 HDPE 140 1.120
5 HDPE 160 0.690
6 HDPE 180 0.742
HSC Connection
Sno. Total Nos.
1 790
Other Details
4.27
0.00
3.38
29-Feb-2024
01-Mar-2024