Project Completion Certificate (Ground Water)
Scheme ID: 20053345 Name of Scheme: Kari Kalwari No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3337 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 22-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 28/239.39 KARI KALWARI 26.52210 79.91747
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 700/59 KARI KALWARI 26.52210 79.91747
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/12 KARI KALWARI 26.52210 79.91747
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.01235
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.846
2 HDPE 90 3.159
3 HDPE 110 2.133
4 HDPE 125 0.409
HSC Connection
Sno. Total Nos.
1 587
Other Details
3.32
0.00
2.84
06-Apr-2024
07-Apr-2024