Project Completion Certificate (Ground Water)
Scheme ID: 20053394 Name of Scheme: MULHI No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2588 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 27-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 1 23.97/195.91 MULHI 26.58253 79.82594
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 JASCO 550/70 MULHI 26.58253 79.82594
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/14 MULHI 26.58253 79.82594
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.0117
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.653
2 HDPE 90 2.051
3 HDPE 110 0.235
4 HDPE 125 0.232
5 HDPE 140 1.529
6 HDPE 160 0.557
HSC Connection
Sno. Total Nos.
1 438
Other Details
2.86
0.00
2.31
14-May-2024
15-May-2024