Project Completion Certificate (Ground Water)
Scheme ID: 20053409 Name of Scheme: Nonari Bujurg No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3842 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 24-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 36.11/179.21 NONARI BUJURG 26.472952 79.773975
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 900/66 NONARI BUJURG 26.472952 79.773975
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/18 NONARI BUJURG 26.472952 79.773975
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.01580
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.008
2 HDPE 90 2.624
3 HDPE 110 0.658
4 HDPE 125 0.948
5 HDPE 140 0.833
6 HDPE 160 0.521
HSC Connection
Sno. Total Nos.
1 974
Other Details
4.08
0.00
3.34
08-Apr-2024
09-Apr-2024