Project Completion Certificate (Ground Water)
Scheme ID: 20053412 Name of Scheme: Barkatpur Water supply scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3903 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 02-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE-WELL 27.6 / 116.8 Barkatpur 29.591984 78.095321
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 494 / 52 Barkatpur 29.591984 78.095321
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL / 16 MTR Barkatpur 29.591984 78.095321
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI- K7 100 0.0255
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.2931
2 HDPE 75 0.2292
3 HDPE 90 0.1697
4 HDPE 110 0.033
5 125 mm 125 0.1689
6 HDPE 140 0.2501
7 HDPE 160 0.019
HSC Connection
Sno. Total Nos.
1 350
Other Details
1.80
0.00
1.83
05-Oct-2024
06-Oct-2024