Project Completion Certificate (Ground Water)
Scheme ID: 20053434 Name of Scheme: SUDERPUR GAJEN No. of Villages: 2 No. of Habitation Covered: 0
Total Population Covered: 2623 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 01-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 20.94/203.40 SUNDERPUR GAJEN 26.57407 79.84608
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 550/70 SUNDERPUR GAJEN 26.57407 79.84608
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/14 SUNDERPUR GAJEN 26.57407 79.84608
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.0965
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.411
2 HDPE 90 0.527
3 HDPE 110 0.049
4 HDPE 125 0.700
5 HDPE 140 0.381
6 HDPE 160 0.960
HSC Connection
Sno. Total Nos.
1 465
Other Details
2.67
0.00
2.19
11-Mar-2024
12-Mar-2024