Project Completion Certificate (Ground Water)
Scheme ID: 20053524 Name of Scheme: KUIT KHEDA 1, SARIYAPUR No. of Villages: 3 No. of Habitation Covered: 2
Total Population Covered: 4209 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 15-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.18/194.85 KUIT KHERA & SARIYAPUR 26.382101 79.892612
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 850/70 KUIT KHERA & SARIYAPUR 26.382101 79.892612
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/14 KUIT KHERA & SARIYAPUR 26.382101 79.892612
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.0121
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.328
2 HDPE 90 3.713
3 HDPE 110 0.482
4 HDPE 125 0.200
5 HDPE 140 1.977
6 HDPE 160 0.579
HSC Connection
Sno. Total Nos.
1 832
Other Details
4.15
0.00
3.39
25-Mar-2024
26-Mar-2024