Project Completion Certificate (Ground Water)
Scheme ID: 20053528 Name of Scheme: SALEMPUR MAHERA1 No. of Villages: 2 No. of Habitation Covered: 0
Total Population Covered: 4201 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Nov-2023 Actual Date of Completion (Capex): 22-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 29.16/190.19 SALEMPUR MAHERA 26.61887 79.76398
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 900/62 SALEMPUR MAHERA 26.61887 79.76398
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275/16 SALEMPUR MAHERA 26.61887 79.76398
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.012
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.981
2 HDPE 90 1.473
3 HDPE 110 0.938
4 HDPE 125 2.390
5 HDPE 140 0.369
6 HDPE 160 0.181
7 HDPE 200 0.656
HSC Connection
Sno. Total Nos.
1 689
Other Details
4.12
0.00
3.38
06-Mar-2024
07-Mar-2024