Project Completion Certificate (Ground Water)
Scheme ID: 20054027 Name of Scheme: BASDEELA RAUSAR JJM No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4280 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Sep-2024 Actual Date of Completion (Capex): 26-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.08/117.86 mtr. Basdeela Rausar 26.750886 83.582352
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT pump-1 0.015/41 BASDEELA RASUAR 26.750886 83.582352
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZINC ALUME TYPE OHT 250/14 BASDEELA RASUAR 26.750886 83.582352
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 150 .03 COMPLETED
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 11.235
2 HDPE 75 .956
3 HDPE 90 .166
4 HDPE 140 1.261
HSC Connection
Sno. Total Nos.
1 779
Other Details
2.71
2.30
2.25
26-Nov-2024
26-Feb-2025