Scheme ID: 20054259 Name of Scheme: BHAWANIPUR PRATAP GRAMIN PEYJAL YOJNA No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 1791 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jan-2024 Actual Date of Completion (Capex): 29-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM DIA SLOTTED PIPE 15 BAVANIPUR PRATAP 27.085101 79.855227
2 150MM DIA PLAIN PIPE 65 BAVANIPUR PRATAP 27.085101 79.855227
3 200MM DIA PLAIN HOUSEING PIPE 60.30 BAVANIPUR PRATAP 27.085101 79.855227
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 371/66 BAVANIPUR PRATAP 27.085101 79.855227
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zn-Al TANK 125/16 BAVANIPUR PRATAP 27.085101 79.855227
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DISTIBUTION PIPE/HDPE 63 3.204
2 DISTIBUTION PIPE/HDPE 75 1.17
3 DISTIBUTION PIPE/HDPE 90 0.483
4 DISTIBUTION PIPE/HDPE 125 0.207
5 DISTIBUTION PIPE/HDPE 140 0.067
HSC Connection
Sno. Total Nos.
1 340
Other Details
1.92
2.02
0.00
29-Jan-2026
30-Jan-2026