Project Completion Certificate (Ground Water)
Scheme ID: 20055881 Name of Scheme: Salhoopur PWS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1760 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 15-Jul-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 10.02/112.50 SALHOOPUR 26.649454* 79.416352*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 21/41 SALHOOPUR 26.649454* 79.416352*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 SALHOOPUR 26.649561* 79.416683*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 34.30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3949.90
2 HDPE 75 2271.10
3 HDPE 110 757.80
4 HDPE 140 692.30
HSC Connection
Sno. Total Nos.
1 316
Other Details
1.67
1.71
1.71
19-Jul-2024
20-Jul-2024