Project Completion Certificate (Ground Water)
Scheme ID: 20055987 Name of Scheme: RASOOLPUR AIMA (GOGP) JJM No. of Villages: 6 No. of Habitation Covered: 8
Total Population Covered: 5300 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 05-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27M/105M RASOOLPUR AIMA 27.342017 79.966426
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 67.2M³/47M RASOOLPUR AIMA 27.342017 79.966426
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 325KL/18M RASOOLPUR AIMA 27.342017 79.966426
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 2.785
2 HDPE PIPE PN:-6 75 3.614
3 HDPE PIPE PN:-6 90 2.646
4 HDPE PIPE PN:-6 110 3.633
5 HDPE PIPE PN:-6 125 1.398
6 HDPE PIPE PN:-6 140 1.115
7 HDPE PIPE PN:-6 160 1.962
8 HDPE PIPE PN:-6 180 0.173
9 HDPE PIPE PN:-6 200 0.052
HSC Connection
Sno. Total Nos.
1 1080
Other Details
3.43
0.00
3.57
04-Jul-2025
30-Sep-2025