| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20056125 | Name of Scheme: Nandgaon PWS | No. of Villages: 3 | No. of Habitation Covered: 8 |
| Total Population Covered: 1890 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 10-Oct-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL | 24.0Mtr./153.50Mtr. | NANDGAON | 26.420699 | 79.522447 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | (28.0 M3/Hr.)/53Mtr. | NANDGAON | 26.420699 | 79.522447 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | NANDGAON | 26.420993 | 79.522495 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | .026 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.40 | |
| 2 | HDPE | 75 | 3.03 | |
| 3 | HDPE | 110 | 1.43 | |
| 4 | HDPE | 140 | 1.47 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 366 |