| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20056126 | Name of Scheme: Nasirabad | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3200 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 01-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 24.05 Mtr./109.44 Mtr. | Nasirabad | 26.50581988 | 79.47840266 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | (41.5 M3/Hr.)/53Mtr. | Nasirabad | 26.50581988 | 79.47840266 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200/16 | Nasirabad | 26.505576 | 79.478411 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | .015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.22 | |
| 2 | HDPE | 75 | .37 | |
| 3 | HDPE | 90 | .081 | |
| 4 | HDPE | 110 | .15 | |
| 5 | HDPE | 140 | .88 | |
| 6 | HDPE | 180 | .15 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 650 |