| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20056132 | Name of Scheme: Bondepur grameen PWS | No. of Villages: 3 | No. of Habitation Covered: 5 |
| Total Population Covered: 4000 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-Sep-2023 | Actual Date of Completion (Capex): 07-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 17.00/125.61 M | BONDEPUR GRAMIN | 26.73170522 | 79.38806728 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 59.9 M3/45 | BONDEPUR GRAMIN | 26.73170522 | 79.38806728 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 300/16 | BONDEPUR GRAMIN | 26.7318188 | 79.38814385 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 23.80 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8241.60 | |
| 2 | HDPE | 75 | 718 | |
| 3 | HDPE | 90 | 1603.5 | |
| 4 | HDPE | 110 | 1545 | |
| 5 | HDPE | 140 | 1599 | |
| 6 | HDPE | 180 | 283 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 538 |