| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20056396 | Name of Scheme: REWALI WSS | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 3850 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 28-Jun-2023 | Actual Date of Completion (Capex): 25-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 24/64.80 | REWALI | 26o 24' 36.919" N | 82o 19' 28.92" E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VTPump-1 | 33/45 | REWALI | 26o 24' 36.919" N | 82o 19' 28.92" E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150/14 | REWALI | 26o 24' 36.919" N | 82o 19' 28.92" E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-7 | 100 | 0.04 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 8.706 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 2.037 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 0.578 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.071 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 1.047 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 306 |