Project Completion Certificate (Ground Water)
Scheme ID: 20056723 Name of Scheme: NAURAHANI RAMPUR WSS No. of Villages: 3 No. of Habitation Covered: 9
Total Population Covered: 6820 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 24-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.0/76.3 NAUHARANI RAMPUR 26O 33' 43.89" N 82O 47' 42.75" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 57/46 NAUHARANI RAMPUR 26O 33' 43.89" N 82O 47' 42.75" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275/16 NAUHARANI RAMPUR 26O 33' 43.89" N 82O 47' 42.75" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 20.906
2 HDPE Pipe PN-6: Class PE-100 75 03.641
3 HDPE Pipe PN-6: Class PE-100 90 01.399
4 HDPE Pipe PN-6: Class PE-100 110 0.999
5 HDPE Pipe PN-6: Class PE-100 125 0.453
6 HDPE Pipe PN-6: Class PE-100 140 0.034
7 HDPE Pipe PN-6: Class PE-100 180 0.413
8 HDPE Pipe PN-6: Class PE-100 200 0.282
HSC Connection
Sno. Total Nos.
1 654
Other Details
345.45
0.00
0.00
14-Jul-2025
15-Jul-2025