Project Completion Certificate (Ground Water)
Scheme ID: 20056766 Name of Scheme: RAKSAMA TAKIYARAM VILLAGE WATER SUPPLY SCHEME No. of Villages: 5 No. of Habitation Covered: 17
Total Population Covered: 3920 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 10-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MS Pipe 24.04/215.76 RAKSAMA TAKIYARAM 25.6079270 82.7941980
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 H.P. 550/44 RAKSAMA TAKIYARAM 25.6079270 82.7941980
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 15/12 RAKSAMA TAKIYARAM 25.6079270 82.7941980
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 100 0.017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.351
2 HDPE Pipe PN-6: Class PE-100 75 2.034
3 HDPE Pipe PN-6: Class PE-100 63 8.2
4 HDPE Pipe PN-6: Class PE-100 110 0.458
5 HDPE Pipe PN-6: Class PE-100 125 0.778
6 HDPE Pipe PN-6: Class PE-100 140 0.341
7 HDPE Pipe PN-6: Class PE-100 160 0.024
HSC Connection
Sno. Total Nos.
1 357
Other Details
1.86
1.86
1.86
10-Mar-2025
13-Mar-2025