Project Completion Certificate (Ground Water)
Scheme ID: 20056795 Name of Scheme: AUWAR VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 3905 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Jan-2023 Actual Date of Completion (Capex): 18-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200X150 27 M/223.8 M AUWAR 25.624413 82.875148
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP 800 LPM/44 M AUWAR 25.624413 82.875148
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/12 M AUWAR 25.624377 82.874998
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI,K_7 150 0.0195 yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.107 yes
2 HDPE 75 2.222 yes
3 HDPE 63 10.632 yes
4 HDPE 110 1.532 yes
5 HDPE 140 0.414 yes
6 HDPE 160 0.072 yes
7 HDPE 180 0.496 yes
8 HDPE 200 0.186 yes
HSC Connection
Sno. Total Nos.
1 550
Other Details
2.18
2.18
2.28
18-Jan-2026
19-Jan-2026