| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20057169 | Name of Scheme: GOVARDHANPUR JJM | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 4160 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 02-Feb-2024 | Actual Date of Completion (Capex): 26-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24 M/ 98.8 M | GOVARDHANPUR | 27.31798 | 80.358007 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.900 M³ per Min /45Mtr | GOVARDHANPUR | 27.31798 | 80.358007 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 275 KL/ 14 Mtr | GOVARDHANPUR | 27.317955 | 80.358289 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D. I. Pipe | 150 | 0.02035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, Class PE-100 | 63 | 4.008 | |
| 2 | HDPE Pipe PN-6, Class PE-100 | 75 | 2.309 | |
| 3 | HDPE Pipe PN-6, Class PE-100 | 90 | 1.142 | |
| 4 | HDPE Pipe PN-6, Class PE-100 | 110 | 0.373 | |
| 5 | HDPE Pipe PN-6, Class PE-100 | 125 | 2.627 | |
| 6 | HDPE Pipe PN-6, Class PE-100 | 160 | 1.494 | |
| 7 | HDPE Pipe PN-6, Class PE-100 | 200 | 0.030 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 776 |