| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20057541 | Name of Scheme: Kuvkavwar water supply scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3170 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 05-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 1. MSERW Plain Pipe As Per IS 4270 - 300 mm Dia | 51.06 | Kukuvar | 25.954293 | 82.182485 |
| 2 | 2. MSERW pipe slotted Pipe As Per IS 8110 - 300 mm Dia | 15.04 | Kukuvar | 25.954293 | 82.182485 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 10HP | 27 / 45 | Kukuvar | 25.954293 | 82.182485 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast-in-Situ | 125 KL / 12 M | Kukuvar | 25.954293 | 82.182485 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 30 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 9031.80 | |
| 2 | HDPE | 75 | 344.00 | |
| 3 | HDPE | 90 | 225.00 | |
| 4 | HDPE | 110 | 313.50 | |
| 5 | HDPE | 125 | 100.50 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 251 |