Project Completion Certificate (Ground Water)
Scheme ID: 20057541 Name of Scheme: Kuvkavwar water supply scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3170 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 05-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 1. MSERW Plain Pipe As Per IS 4270 - 300 mm Dia 51.06 Kukuvar 25.954293 82.182485
2 2. MSERW pipe slotted Pipe As Per IS 8110 - 300 mm Dia 15.04 Kukuvar 25.954293 82.182485
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10HP 27 / 45 Kukuvar 25.954293 82.182485
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast-in-Situ 125 KL / 12 M Kukuvar 25.954293 82.182485
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9031.80
2 HDPE 75 344.00
3 HDPE 90 225.00
4 HDPE 110 313.50
5 HDPE 125 100.50
HSC Connection
Sno. Total Nos.
1 251
Other Details
1.84
1.83
1.63
08-Dec-2024
09-Dec-2024