Project Completion Certificate (Ground Water)
Scheme ID: 20057572 Name of Scheme: KARI MAKUAPUR WSS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2160 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Nov-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18/92.06 KARI MAKUAPUR 27.820022 79.892587
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 25.2/41 KARI MAKUAPUR 27.820022 79.892587
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 100/12 KARI MAKUAPUR 27.820088 79.892503
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 100 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 4.211
2 HDPE / 6KG 75 0.175
3 HDPE / 6KG 90 0.645
4 HDPE / 6KG 110 0.905
5 HDPE / 6KG 140 0.275
HSC Connection
Sno. Total Nos.
1 380
Other Details
1.70
0.00
1.70
29-Feb-2024
06-Dec-2024