| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20057626 | Name of Scheme: KUDIRNA WSS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3060 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 05-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24.00/96.07 | KUDIRNA | 28.040983 | 79.852328 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP - 1 | 37.32 M3/45M | KUDIRNA | 28.040983 | 79.852328 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175 KL - 12 M | KUDIRNA | 28.040979 | 79.852332 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 125 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/6KG | 63 | 3.560 | |
| 2 | HDPE/6KG | 75 | 0.331 | |
| 3 | HDPE/6KG | 90 | 0.038 | |
| 4 | HDPE/6KG | 110 | 0.239 | |
| 5 | HDPE/6KG | 140 | 0.227 | |
| 6 | HDPE/6KG | 160 | 0.040 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 724 |