Project Completion Certificate (Ground Water)
Scheme ID: 20057695 Name of Scheme: HARRAIYA JJM No. of Villages: 1 No. of Habitation Covered: 10
Total Population Covered: 5570 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Feb-2024 Actual Date of Completion (Capex): 03-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30 M/ 111.8 M HARRAIYA 27.25768 80.574148
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.170 M³ per Min /41 Mtr HARRAIYA 27.25768 80.574148
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 350 KL/ 12 Mtr HARRAIYA 27.257679 80.57426
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 6.4256
2 HDPE Pipe PN-6: Class PE-100 75 6.028
3 HDPE Pipe PN-6: Class PE-100 90 4.126
4 HDPE Pipe PN-6: Class PE-100 110 3.5921
5 HDPE Pipe PN-6: Class PE-100 125 0.396
6 HDPE Pipe PN-6: Class PE-100 140 2.4864
7 HDPE Pipe PN-6: Class PE-100 160 1.9156
8 HDPE Pipe PN-6: Class PE-100 200 0.5029
HSC Connection
Sno. Total Nos.
1 935
Other Details
3.82
0.00
3.84
02-Sep-2024
26-Sep-2025