| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20057715 | Name of Scheme: SAINTI (GOGP) JJM | No. of Villages: 3 | No. of Habitation Covered: 11 |
| Total Population Covered: 6070 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 10-Sep-2024 | Actual Date of Completion (Capex): 08-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30M/105M | SAINTI | 27.428378 | 80.273424 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMPq | 76.2M³/45M | SAINTI | 27.428378 | 80.273424 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 375KL/16M | SAINTI | 27.428378 | 80.273424 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 200 | 0.032 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN:-6 | 63 | 6.003 | |
| 2 | HDPE PIPE PN:-6 | 75 | 6.213 | |
| 3 | HDPE PIPE PN:-6 | 90 | 3.605 | |
| 4 | HDPE PIPE PN:-6 | 110 | 0.273 | |
| 5 | HDPE PIPE PN:-6 | 125 | 1.462 | |
| 6 | HDPE PIPE PN:-6 | 140 | 0.282 | |
| 7 | HDPE PIPE PN:-6 | 160 | 1.037 | |
| 8 | HDPE PIPE PN:-6 | 180 | 0.00 | |
| 9 | HDPE PIPE PN:-6 | 200 | 2.078 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1200 |