Project Completion Certificate (Ground Water)
Scheme ID: 20057751 Name of Scheme: SIHONA (GOGP) JJM No. of Villages: 3 No. of Habitation Covered: 7
Total Population Covered: 6020 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 10-Sep-2024 Actual Date of Completion (Capex): 19-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 29M/117M SIHONA 27.433063 80.344817
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 70.2M³/45M SIHONA 27.433063 80.344817
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350KL/16M SIHONA 27.433063 80.344817
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 200 0.031
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 5.219
2 HDPE PIPE PN:-6 75 4.284
3 HDPE PIPE PN:-6 90 2.956
4 HDPE PIPE PN:-6 110 2.135
5 HDPE PIPE PN:-6 125 0.00
6 HDPE PIPE PN:-6 140 0.355
7 HDPE PIPE PN:-6 160 2.183
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.036
HSC Connection
Sno. Total Nos.
1 1140
Other Details
3.72
0.00
3.82
18-Sep-2025
26-Sep-2025