Project Completion Certificate (Ground Water)
Scheme ID: 20057908 Name of Scheme: Husenpur water supply scheme No. of Villages: 4 No. of Habitation Covered: 8
Total Population Covered: 2706 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 09-May-2024 Actual Date of Completion (Capex): 20-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 10/36.52 HUNSEPUR 25.95278 82.9982
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 400/46 HUNSEPUR 25.95278 82.9982
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125/12 HUNSEPUR 25.95278 82.9982
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI PIPE 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 12.777
2 HDPE Pipe PN-6: Class PE-100 75 0.962
3 HDPE Pipe PN-6: Class PE-100 90 0.333
4 HDPE Pipe PN-6: Class PE-100 110 0.336
HSC Connection
Sno. Total Nos.
Other Details
1.79
1.79
2.28
20-Nov-2024