| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20058058 | Name of Scheme: LONAR JJM | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 4180 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 27-Jul-2024 | Actual Date of Completion (Capex): 25-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 27 m/98 m | LONAR | 27.402708 | 79.915992 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 870 LPM/43 M | LONAR | 27.402708 | 79.915992 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250 KL/14 M | LONAR | 27.402708 | 79.915992 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.033 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.683 | |
| 2 | HDPE | 75 | 6.034 | |
| 3 | HDPE | 90 | 3.116 | |
| 4 | HDPE | 125 | 0.219 | |
| 5 | HDPE | 160 | 0.461 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 974 |