Project Completion Certificate (Ground Water)
Scheme ID: 20058071 Name of Scheme: Hasanpur water supply scheme No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 3208 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 09-May-2024 Actual Date of Completion (Capex): 22-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.08/96.84 HaqsanPur 26.003736 83.082449
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 500/46 HaqsanPur 26.003736 83.082449
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125/12 HaqsanPur 26.003736 83.082449
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI PIPE 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 5.320
2 HDPE Pipe PN-6: Class PE-100 75 0.750
3 HDPE Pipe PN-6: Class PE-100 90 0.510
4 HDPE Pipe PN-6: Class PE-100 110 0.420
5 HDPE Pipe PN-6: Class PE-100 140 0.25
HSC Connection
Sno. Total Nos.
1 143
Other Details
1.78
1.78
1.98
21-Oct-2024