| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20058071 | Name of Scheme: Hasanpur water supply scheme | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 3208 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 09-May-2024 | Actual Date of Completion (Capex): 22-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.08/96.84 | HaqsanPur | 26.003736 | 83.082449 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 500/46 | HaqsanPur | 26.003736 | 83.082449 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125/12 | HaqsanPur | 26.003736 | 83.082449 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI PIPE | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 5.320 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 0.750 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 0.510 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.420 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.25 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 143 |