Project Completion Certificate (Ground Water)
Scheme ID: 20058100 Name of Scheme: SINGARAMAU GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 3130 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 27-Jan-2024 Actual Date of Completion (Capex): 15-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200X200 23 M/ 75 M SINGRAMAU 25.949333 82.401438
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP 660 LPM/48 M SINGRAMAU 25.949333 82.401438
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL /16 M SINGRAMAU 25.949458 82.401422
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 200 0.0033 YES
2 DI, K-7 150 0.0199 YES
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.790 YES
2 HDPE 75 0.923 YES
3 HDPE 63 8.669 YES
4 HDPE 140 0.3036 YES
5 HDPE 160 0.629 YES
6 HDPE 200 0.035 YES
HSC Connection
Sno. Total Nos.
1 450
Other Details
2.64
2.64
2.43
15-Jan-2026
16-Jan-2026