| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20058100 | Name of Scheme: SINGARAMAU GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 5 |
| Total Population Covered: 3130 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 27-Jan-2024 | Actual Date of Completion (Capex): 15-Jan-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200X200 | 23 M/ 75 M | SINGRAMAU | 25.949333 | 82.401438 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP | 660 LPM/48 M | SINGRAMAU | 25.949333 | 82.401438 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 KL /16 M | SINGRAMAU | 25.949458 | 82.401422 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI, K-7 | 200 | 0.0033 | YES |
| 2 | DI, K-7 | 150 | 0.0199 | YES |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.790 | YES |
| 2 | HDPE | 75 | 0.923 | YES |
| 3 | HDPE | 63 | 8.669 | YES |
| 4 | HDPE | 140 | 0.3036 | YES |
| 5 | HDPE | 160 | 0.629 | YES |
| 6 | HDPE | 200 | 0.035 | YES |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 450 |