Project Completion Certificate (Ground Water)
Scheme ID: 20058125 Name of Scheme: Pandaha water supply scheme No. of Villages: 4 No. of Habitation Covered: 8
Total Population Covered: 2710 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 09-May-2024 Actual Date of Completion (Capex): 13-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/118.28 Pandaha 26.016849 83.091301
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 400/46 Pandaha 26.016849 83.091301
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125/12 Pandaha 26.016849 83.091301
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI Pipe 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 4.20
2 HDPE Pipe PN-6: Class PE-100 75 1.34
3 HDPE Pipe PN-6: Class PE-100 90 0.27
4 HDPE Pipe PN-6: Class PE-100 110 0.47
HSC Connection
Sno. Total Nos.
1 310
Other Details
1.72
1.72
1.84
12-Jun-2024
13-Jun-2024