| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20058159 | Name of Scheme: Dheengarpur Village Water Supply Scheme | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 7208 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 10-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 58.8 Mtr / 132 Mtr | Dheengarpur | 29.021088 | 78.443382 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 850 LPM / 45 Mtr | Dheengarpur | 29.021088 | 78.443382 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 300 KL / 14 Mtr | Dheengarpur | 29.021088 | 78.443382 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 DI PIPE | 150 | 0.042 | RISING MAIN COMPLETED |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6: CLASS PE-100 | 63 | 6.258 | COMPLETED |
| 2 | HDPE PIPE PN-6: CLASS PE-100 | 75 | 0.262 | COMPLETED |
| 3 | HDPE PIPE PN-6: CLASS PE-100 | 90 | 0.161 | COMPLETED |
| 4 | HDPE PIPE PN-6: CLASS PE-100 | 110 | 0.215 | COMPLETED |
| 5 | HDPE PIPE PN-6: CLASS PE-100 | 140 | 0.427 | COMPLETED |
| 6 | HDPE PIPE PN-6: CLASS PE-100 | 160 | 1.11 | COMPLETED |
| 7 | HDPE PIPE PN-6: CLASS PE-100 | 180 | 0.217 | COMPLETED |
| 8 | HDPE PIPE PN-6: CLASS PE-100 | 200 | 0.236 | COMPLETED |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 626 |