Scheme ID: 20058287 Name of Scheme: Tandava WSS No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2610 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Jan-2024 Actual Date of Completion (Capex): 09-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.03/101.27 TANDAVA 26.678797 81.784238
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 542LPM / 40Mtr TANDAVA 26.678797 81.784238
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/14 TANDAVA 26.678816 81.78412
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.0347
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.3780
2 HDPE Pipe PN-6: Class PE-100 180 0.6180
3 HDPE Pipe PN-6: Class PE-100 160 0.7260
4 HDPE Pipe PN-6: Class PE-100 140 0.1740
5 HDPE Pipe PN-6: Class PE-100 125 0.2760
6 HDPE Pipe PN-6: Class PE-100 110 0.4913
7 HDPE Pipe PN-6: Class PE-100 90 0.5240
8 HDPE Pipe PN-6: Class PE-100 75 0.9326
9 HDPE Pipe PN-6: Class PE-100 63 6.8467
HSC Connection
Sno. Total Nos.
1 502
Other Details
2.29
0.00
2.78
09-May-2024