Project Completion Certificate (Ground Water)
Scheme ID: 20058306 Name of Scheme: SONGAWN WSS No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 3260 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 26-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 24.15/80.60 Son Gawn 26º 21' 9.598" N 82º 42' 34.158" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 42/45 Songawn 26º 21' 9.598" N 82º 42' 34.158" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC ZAT 200/14 Songawn 26º 21' 9.598" N 82º 42' 34.158" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.40
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 11.56
2 HDPE Pipe PN-6: Class PE-100 75 3.99
3 HDPE Pipe PN-6: Class PE-100 90 1.88
4 HDPE Pipe PN-6: Class PE-100 110 0.752
5 HDPE Pipe PN-6: Class PE-100 140 1.197
6 HDPE Pipe PN-6: Class PE-100 160 1.468
7 HDPE Pipe PN-6: Class PE-100 200 0.257
HSC Connection
Sno. Total Nos.
1 344
Other Details
2.94
0.00
0.00
26-Mar-2025
27-Mar-2025