Project Completion Certificate (Ground Water)
Scheme ID: 20058331 Name of Scheme: Betauli WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2240 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Oct-2023 Actual Date of Completion (Capex): 20-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.00/126.02 Betauli 26.685654 81.806553
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 470LPM / 40Mtr Betauli 26.685654 81.806553
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Betauli 26.685607 81.806697
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.012
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.0000
2 HDPE Pipe PN-6: Class PE-100 180 0.0000
3 HDPE Pipe PN-6: Class PE-100 160 0.0000
4 HDPE Pipe PN-6: Class PE-100 140 0.0286
5 HDPE Pipe PN-6: Class PE-100 125 0.2156
6 HDPE Pipe PN-6: Class PE-100 110 1.0485
7 HDPE Pipe PN-6: Class PE-100 90 0.6590
8 HDPE Pipe PN-6: Class PE-100 75 0.4047
9 HDPE Pipe PN-6: Class PE-100 63 6.3330
HSC Connection
Sno. Total Nos.
1 459
Other Details
2.04
0.00
2.45
20-May-2024
30-Nov-2024