| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20058408 | Name of Scheme: Bangaona And Firozpur pawaran WSS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 4390 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 22-Jan-2024 | Actual Date of Completion (Capex): 09-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30.13/105.67 | Firozpur Pawaran | 26.795123 | 81.732923 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 924LPM | Firozpur pawaran | 26.795123 | 81.732923 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 275/14 | Firozpur Pawaran | 26.795172 | 81.732765 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI- K7 | 125 | 0.0309 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 200 | 0.79009 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 180 | 0.5137 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 160 | 1.3200 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.1859 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 0.5489 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.1760 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 90 | 0.6600 | |
| 8 | HDPE Pipe PN-6: Class PE-100 | 75 | 0.7084 | |
| 9 | HDPE Pipe PN-6: Class PE-100 | 63 | 8.0259 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 678 |