Project Completion Certificate (Ground Water)
Scheme ID: 20058490 Name of Scheme: KANAK PATTI Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1690 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 30-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell assembly 18/126.80 Kanakpatti 26.435995 82.484719
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submersible pumping 7.5 HP 400 Kanakpatti 26.43 82.48
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 100/14 Kanakpatti 26.435 82.484
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.032
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 6.672
2 HDPE Pipe PN-6: Class PE-100 90 0.300
3 HDPE Pipe PN-6: Class PE-100 75 0.045
4 HDPE Pipe PN-6: Class PE-100 110 0.734
HSC Connection
Sno. Total Nos.
1 267
Other Details
1.54
1.54
1.54
30-Sep-2024
01-Oct-2024