| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20058508 | Name of Scheme: HARAKPUR KAURAHA Water Supply Scheme | No. of Villages: 3 | No. of Habitation Covered: 8 |
| Total Population Covered: 2310 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2052 |
| Date of Completion (As per Contract): 16-Jul-2023 | Actual Date of Completion (Capex): 19-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of tubewell assembly | 18.03/131.78 | HARAKPUR KAURAHA | 26.309659 | 82.578501 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | ACsubmersible pumping 10 HP | 500LPM/45 | HARAKPUR KAURAHA | 26.31013 | 82.578 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 150/14 | HARAKPUR KAURAHA | 26.31025 | 82.5791 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI ,K-7 | 100 | 0.032 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 90 | 0.610 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 2.966 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 63 | 10.158 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 1.135 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.259 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.178 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 351 |