Project Completion Certificate (Ground Water)
Scheme ID: 20058549 Name of Scheme: JAJUPARA (GOGP) JJM No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 6600 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Aug-2024 Actual Date of Completion (Capex): 18-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 36 M/110 M JAJUPARA 27.705726 80.266231
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 1400 LPM/45 M JAJUPARA 27.705726 80.266231
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400 KL/16 M JAJUPARA 27.705726 80.266231
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.049
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.168
2 HDPE 75 5.503
3 HDPE 90 3.250
4 HDPE 110 0.313
5 HDPE 125 0.166
6 HDPE 160 1.584
7 HDPE 180 0.286
8 HDPE 200 0.218
HSC Connection
Sno. Total Nos.
1 1203
Other Details
3.57
0.00
3.64
17-Feb-2025
26-Sep-2025