Project Completion Certificate (Ground Water)
Scheme ID: 20058572 Name of Scheme: Gagaupur Rural Village Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 2701 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2024 Actual Date of Completion (Capex): 01-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Depth of Plain Pipe (m) 99.7 TW 26.125869 83.223648
2 Depth of Strainer (m) 33.04 TW 26.125869 83.223648
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 555/45 TW 26.125869 83.223648
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 175/12 OHT 26.125869 83.223648
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI k -9 100 30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 10.12
2 HDPE 75 0.25
3 HDPE 90 0.34
4 HDPE 110 0.45
5 HDPE 140 1.12
HSC Connection
Sno. Total Nos.
1 437
Other Details
2.34
2.29
1.97
01-Apr-2025
02-Apr-2025