Project Completion Certificate (Ground Water)
Scheme ID: 20058590 Name of Scheme: BIRALASI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 6793 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Sep-2022 Actual Date of Completion (Capex): 07-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 33.01 M / 119.72 M BIRALSI 29.569419 77.51277
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 1400 LPM / 49 M BIRALSI 29.569419 77.51277
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400 KL / 14 M BIRALSI 29.569419 77.51277
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 250 0.042
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.79056
2 HDPE 75 0.59767
3 HDPE 63 7.54618
4 HDPE 110 1.26759
5 HDPE 125 0.93468
6 HDPE 140 0.14250
7 HDPE 160 0.14265
8 HDPE 180 0.1639
9 HDPE 200 0.777
HSC Connection
Sno. Total Nos.
1 1333
Other Details
4.42
0.00
4.42
08-Oct-2024
09-Oct-2024