Scheme ID: 20058607 Name of Scheme: JAMKURA JJM No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 4450 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Feb-2024 Actual Date of Completion (Capex): 11-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30 M/ 99.3 M JAMKURA 27.084467 80.550487
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.930 M³ per Min /41 Mtr JAMKURA 27.084467 80.550487
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275 KL/ 12 Mtr JAMKURA 27.0844678 80.550416
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 2.9423
2 HDPE Pipe PN-6: Class PE-100 75 3.3107
3 HDPE Pipe PN-6: Class PE-100 90 1.0422
4 HDPE Pipe PN-6: Class PE-100 110 0.8568
5 HDPE Pipe PN-6: Class PE-100 125 0.2794
6 HDPE Pipe PN-6: Class PE-100 140 0.7129
7 HDPE Pipe PN-6: Class PE-100 160 1.6317
8 HDPE Pipe PN-6: Class PE-100 180 0.3306
9 HDPE Pipe PN-6: Class PE-100 200 0.076
HSC Connection
Sno. Total Nos.
1 778
Other Details
2.71
0.00
2.69
10-Aug-2024
23-Sep-2026