Project Completion Certificate (Ground Water)
Scheme ID: 20058721 Name of Scheme: Kundol No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3770 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Jan-2024 Actual Date of Completion (Capex): 15-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.08 Mtr / 115.78 Mtr KUNDOL 26.539693* 79.132714*
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 45.01 m^3/ 75.00 Mtr KUNDOL 26.539693* 79.132714*
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 KL/ 18 Mtr KUNDOL 26.539693* 79.132714*
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 .023
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.95
2 HDPE 75 1.67
3 HDPE 90 0.78
4 HDPE 110 1.03
5 HDPE 140 1.15
6 HDPE 160 1.05
7 HDPE 180 0.45
HSC Connection
Sno. Total Nos.
1 781
Other Details
2.48
2.67
2.67
17-Sep-2024
18-Sep-2024