Project Completion Certificate (Ground Water)
Scheme ID: 20058740 Name of Scheme: SAIDPUR RASEEDPUR WSS No. of Villages: 4 No. of Habitation Covered: 16
Total Population Covered: 4420 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2023 Actual Date of Completion (Capex): 28-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 36/68.80 SAIDPUR RASEEDPUR 26º 27' 43.269" N 82º 51' 7.369" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 57/43 SAIDPUR RASEEDPUR 26º 27' 43.269" N 82º 51' 7.369" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 .04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 15.575
2 HDPE Pipe PN-6: Class PE-100 75 2.863
3 HDPE Pipe PN-6: Class PE-100 90 2.129
4 HDPE Pipe PN-6: Class PE-100 110 0.420
5 HDPE Pipe PN-6: Class PE-100 125 1.319
6 HDPE Pipe PN-6: Class PE-100 140 0.625
7 HDPE Pipe PN-6: Class PE-100 160 0.167
8 HDPE Pipe PN-6: Class PE-100 180 0.095
9 HDPE Pipe PN-6: Class PE-100 200 0.045
HSC Connection
Sno. Total Nos.
1 450
Other Details
319.80
0.00
0.00
21-Oct-2025
22-Oct-2025