Project Completion Certificate (Ground Water)
Scheme ID: 20058747 Name of Scheme: KHANDHERIA JJM No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 4450 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Mar-2024 Actual Date of Completion (Capex): 31-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 28 M/ 111.3 M KHANDHERIA 27.09201 80.184643
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.930 M³ per Min /43 Mtr KHANDHERIA 27.09201 80.184643
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 275 KL/ 14 Mtr KHANDHERIA 27.091968 80.184816
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 200 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 4.6167
2 HDPE Pipe PN-6: Class PE-100 75 2.6521
3 HDPE Pipe PN-6: Class PE-100 90 2.3611
4 HDPE Pipe PN-6: Class PE-100 110 0.5668
5 HDPE Pipe PN-6: Class PE-100 125 0.179
6 HDPE Pipe PN-6: Class PE-100 140 0.0248
7 HDPE Pipe PN-6: Class PE-100 160 1.206
8 HDPE Pipe PN-6: Class PE-100 180 0.018
HSC Connection
Sno. Total Nos.
1 797
Other Details
2.81
0.00
2.82
30-Aug-2024
23-Sep-2026