Project Completion Certificate (Ground Water)
Scheme ID: 20058784 Name of Scheme: EKDALLA, SABUKPUR WSS No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 6820 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Dec-2025 Actual Date of Completion (Capex): 24-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 36.0/68.8 Sabukpur 26Deg 30' 28.35" N 82Deg 45' 1.24" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 60/46 Sabukpur 26Deg 30' 28.35" N 82Deg 45' 1.24" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Zink Alum Tank 300/16 Sabukpur 26Deg 30' 28.35" N 82Deg 45' 1.24" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.40
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 25.317
2 HDPE Pipe PN-6: Class PE-100 75 2.311
3 HDPE Pipe PN-6: Class PE-100 90 00.209
4 HDPE Pipe PN-6: Class PE-100 110 0.717
5 HDPE Pipe PN-6: Class PE-100 125 0.741
6 HDPE Pipe PN-6: Class PE-100 140 0.385
7 HDPE Pipe PN-6: Class PE-100 160 1.104
8 HDPE Pipe PN-6: Class PE-100 180 0.275
9 HDPE Pipe PN-6: Class PE-100 200 0.470
HSC Connection
Sno. Total Nos.
1 430
Other Details
362.70
0.00
0.00
09-Nov-2025
10-Nov-2025