Project Completion Certificate (Ground Water)
Scheme ID: 20058940 Name of Scheme: NAYAGAON JJM No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2630 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Feb-2024 Actual Date of Completion (Capex): 07-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18 M/ 76.3 M NAYAGAON 27.07221 80.24227
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.550 M³ per Min /43Mtr NAYAGAON 27.07221 80.24227
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 14 Mtr NAYAGAON 27.073463 80.237534
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 1.677
2 HDPE Pipe PN-6: Class PE-100 75 2.3085
3 HDPE Pipe PN-6: Class PE-100 90 0.8507
4 HDPE Pipe PN-6: Class PE-100 110 0.278
5 HDPE Pipe PN-6: Class PE-100 125 0.2754
6 HDPE Pipe PN-6: Class PE-100 160 1.0036
HSC Connection
Sno. Total Nos.
1 479
Other Details
1.97
0.00
1.97
06-Jul-2024
23-Sep-2026