Project Completion Certificate (Ground Water)
Scheme ID: 20058967 Name of Scheme: PEDWAN (GOGP) JJM No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3840 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jul-2024 Actual Date of Completion (Capex): 26-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24M/115M PEDWAN 27.697906 79.991389
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 48.6M³/45M PEDWAN 27.697906 79.991389
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250KL/16M PEDWAN 27.697906 79.991389
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN:-6 63 2.230
2 HDPE PIPE PN:-6 75 2.387
3 HDPE PIPE PN:-6 90 3.335
4 HDPE PIPE PN:-6 110 3.887
5 HDPE PIPE PN:-6 125 0.00
6 HDPE PIPE PN:-6 140 0.138
7 HDPE PIPE PN:-6 160 0.158
8 HDPE PIPE PN:-6 180 0.00
9 HDPE PIPE PN:-6 200 0.099
HSC Connection
Sno. Total Nos.
Other Details
2.84
0.00
2.75
25-Jun-2025
23-Sep-2025