| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20058977 | Name of Scheme: RAGHUNATHPUR WATER SUPPLY SCHEME | No. of Villages: 4 | No. of Habitation Covered: 4 |
| Total Population Covered: 2344 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 20-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 24.07 / 131.40 | Raghunathpur | 29.305292 | 78.326116 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 510 / 54 | Raghunathpur | 29.305292 | 78.326116 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 / 16 | Raghunathpur | 29.305292 | 78.326116 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 100 | 0.022 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.8931 | |
| 2 | HDPE | 90 | 2.641 | |
| 3 | HDPE | 110 | 1.1898 | |
| 4 | HDPE | 160 | 0.038 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 326 |